Abnormal load route survey before equipment and dates are fixed

Route feasibility for oversized and heavy movements

Abnormal load route survey before equipment and dates are fixed

A route used by standard traffic may not accept the loaded vehicle envelope. The review connects reliable cargo and vehicle data with physical restrictions, operating constraints and the final delivery manoeuvre.

Technical review of cargo, route and equipmentPermits and escort requirementsDirect response from a specialist

Request a technical transport review

Complete the essential details. We will only request the technical information required for the operation.

Secure request · Direct technical review
Ibercarga

Abnormal load route survey

Starting information

The assessment needs loaded length, width, height, mass, axle arrangement, turning behaviour, origin and destination access points and the intended operating period.

Clearances and swept path

Junctions, roundabouts, medians, narrow sections, tunnels and gates are checked against turning requirements, overhang and loaded clearances.

Gradients, surfaces and bridges

Gradients, breakover points, pavement condition, bridge restrictions and axle distribution can influence route choice or vehicle configuration.

Overhead lines and roadside assets

Power or communication lines, gantries, signs, lighting, trees and other street furniture are identified as constraints that may require coordination.

Access, manoeuvres and indicative output

The outcome may record critical points, assumptions, route alternatives and possible corrective actions. The exact deliverable depends on the agreed scope and is not a substitute for the required authorisation.

FAQ

Frequently asked questions about abnormal load route survey

What information is required before a route survey?

Provide the loaded vehicle envelope, mass and axle arrangement, turning data, exact sites and the expected movement period.

Does a route survey grant permission to travel?

No. It supports planning and permit applications but does not replace an authority decision.

Is a physical survey always required?

Not always. The level of inspection depends on cargo dimensions, route uncertainty, infrastructure and site access.